Home/Advice/Why Use a NICEIC Approved Contractor in Shoreham By Sea?

Advice · West Sussex & West Sussex

Why Use a NICEIC Approved Contractor in Shoreham By Sea?

If you run a shop on the High Street, a unit off Dolphin Road or a workshop near the harbour, the electrics are your legal responsibility, not just a maintenance job. NICEIC approval is one of the simplest ways to tell whether a contractor's commercial work is independently checked. Here is what it means, what it does not mean, and how to use it when comparing quotes.

What NICEIC approval actually tells you

NICEIC is an independent body that assesses electrical businesses. To hold Approved Contractor status, a firm has its work inspected, usually every year, against BS 7671, the wiring regulations. The assessor looks at real completed jobs, test instruments and their calibration records, the firm's certificates, and its public liability insurance, which must be at least £2 million.

It is worth knowing there are two main grades. Domestic Installer covers work in homes only. Approved Contractor covers commercial and industrial work as well, including design, installation, and inspection and testing. For business premises, Approved Contractor is the one to look for.

Approval is not a guarantee that every job will be perfect, and plenty of capable electricians are registered with other bodies such as NAPIT. What it gives you is evidence of regular outside scrutiny and a formal complaints route if something goes wrong.

Why it matters more for business premises

Under the Electricity at Work Regulations 1989, whoever controls a workplace must keep its electrical systems safe. If there is a fire or an injury, you will be asked to show what you did about it. Certificates from an assessed contractor are far easier to defend than an invoice with no test results attached.

In practice, the people who ask for this paperwork are insurers, landlords, licensing officers at Adur District Council and fire risk assessors. Many commercial leases around Shoreham and Lancing Business Park require a satisfactory Electrical Installation Condition Report (EICR) at set intervals, and some insurers specify that it must come from a NICEIC or equivalent registered contractor.

  • Offices and shops: EICR usually every 5 years
  • Industrial units and workshops: usually every 3 years
  • Restaurants, cafes and pubs: usually every 5 years, sometimes sooner on change of tenant
  • Emergency lighting: monthly function test and a full annual duration test
  • Fire alarm systems: serviced every 6 months

Local conditions a good contractor will plan for

Shoreham has its own quirks. Salt air around the harbour, the Beach and the riverside corrodes external fittings, isolators and containment much faster than inland, so equipment outdoors should be suitably IP rated and often stainless or non-metallic. Older units and converted buildings frequently have ageing three-phase boards, mixed wiring from several tenants, and no up-to-date circuit charts.

A contractor who knows the area will ask about these things before pricing, rather than discovering them halfway through. They should also be willing to work around your trading hours, since isolating the supply for testing normally means 1 to 4 hours without power, depending on the size of the installation.

What it is likely to cost

Prices depend on the number of circuits, access, the age of the installation and whether work has to be done out of hours. As a rough guide for the Shoreham area, an EICR for a small shop or office with one distribution board is often £150 to £350. A larger industrial unit with several three-phase boards can run from £400 to over £1,000.

Remedial work is priced separately once the report is done. Ask for the observations to be itemised with their codes: C1 and C2 need fixing to get a satisfactory report, while C3 items are recommendations only. That stops you paying for work you do not strictly need.

How to check a contractor before you book

Do not rely on a logo on a van. Search the firm's name on the NICEIC website and confirm it is listed as an Approved Contractor, not only as a Domestic Installer. Then ask a few plain questions.

  • Will I get an Electrical Installation Certificate or EICR with full test results?
  • Who will actually carry out the work, and what are their inspection and testing qualifications?
  • Can you show public liability insurance, and professional indemnity cover if you are doing design work?
  • Have you worked on similar premises nearby, and can I speak to that customer?
  • Is the quote fixed, and what would cause it to change?

Published 6 October 2026

Frequently asked.

Is it a legal requirement to use a NICEIC approved contractor for commercial work?+

No. The law requires the work to be done by a competent person and the installation to be kept safe, but it does not name a specific body. In practice many insurers, landlords and tender documents ask for NICEIC or an equivalent registration, so it often becomes a requirement by contract.

How often does a business in Shoreham By Sea need an EICR?+

Most shops, offices and hospitality premises are inspected every 5 years, and industrial units every 3 years. Your lease, insurer or the previous report may set a shorter interval, and harsh conditions such as salt exposure near the harbour can justify more frequent checks.

What should I receive when the work is finished?+

For new work you should get an Electrical Installation Certificate or a Minor Works Certificate with schedules of test results, and for an inspection you should get an EICR. Keep these with your fire risk assessment and insurance documents, as you may be asked to produce them.

Related help.

Need an electrician
this week?

EICR, EV charger, fuse board, fire alarm or full installation. Call the office or send a few details and we will come back with a price.

Get a quote.

Tell us about the job. We will come back with a price, or come out to take a look. EICRs, installations, EV chargers and fire alarm systems across West Sussex.